OEP (ON-SITE EMERGENCY PLAN)

on site plan

OEP (On-Site Emargency Plan)

  1. Receiving of necessary documents (List will be given by us in advance).
  2. Review of the information received.
  3. Preparation of ON-SITE EMERGENCY PLAN as per Schedule 8-A of Gujarat Factory Rules, Rule No. 68-J (12) (I). V Nature 8 Levels of Emergency will be defined
  4. Structure of the Emergency Management System will be proposed
  5. Duties of Chief Emergency Controller, incident Controller, Deputy Incident Controller, and SMC will be defined.
  6. Other elements like Assembly Points, ECC, Communication System, Medical Services, and Mutual Aid Members will be covered. V Action on-site during an emergency, actions to avoid emergency and post-emergency actions will be proposed.
  7. A draft report will be submitted for your review and approval.
  8. On approval of the draft report, the final report will be prepared and submitted to you.

Our team will get in touch with you ASAP

RELATED SERVICES

ERDMP

ERDMP Methodology Receiving of necessary documents (checklist and schedules as per PNGRB guidelines) from client.  Review of the information received. Preparation of

SAFETY REPORT (68K)

SAFETY REPORT (68K) Methodology Receiving of necessary documents (List will be given by us in advance). Review of the information received. Preparation

OEP (ON-SITE EMERGENCY PLAN) OEP (On-Site Emargency Plan) Receiving of necessary documents (List will be given by us in advance). Review of

Any question?

Send us a message and we'll respond soon.

Scroll to Top
Contact US N

This will close in 20 seconds